Introduction

previous  Top  next

The break supervision module is designed for break supervision to be scheduled after the timetable has been completed.

 

The following chapters take you through the steps necessary for scheduling break supervision, from preparatory master data input and actual scheduling through to the publication of the supervisions in the timetable as a printed report or on the Internet.

 

The examples contained in this chapter can best be followed using the Demo6.gpn file. The input required for the break supervision module has already been made in this file.